{"schemaVersion":"matrix-product-facts/v1","identity":{"mpn":"1SVR740660R0100","brand":"ABB","brandSlug":"abb","productSlug":"1SVR740660R0100","canonicalUrl":"https://aoctrl.com/abb/1SVR740660R0100","factsUrl":"https://aoctrl.com/api/mcp/products/1SVR740660R0100","rawCanonicalId":null},"summary":{"shortDescription":"ABB 1SVR740660R0100 CM-IWS.1P single-phase insulation monitor, lifecycle stage current, estimated lead time 4-6 weeks.","salesMarkdown":"The ABB 1SVR740660R0100 is a CM-IWS.1P single-phase insulation monitor, used to detect insulation degradation in ungrounded AC systems (IT systems) before a ground fault develops. It's a panel-mount device typically integrated into industrial power distribution or motor control centers where continuous insulation level monitoring is required. ## Sourcing Reality Because the part is current-production and the lead time is quoted as 4-6 weeks, the sourcing path is straightforward: submit an RFQ with your quantity and target delivery window. There is no last-time-buy pressure or obsolescence risk on this line right now. No official successor or cross-reference exists — this is the active order code for the CM-IWS.1P function.","metaTitle":"ABB 1SVR740660R0100 CM-IWS.1P Insulation Monitor, Current","metaDescription":"ABB 1SVR740660R0100 CM-IWS.1P insulation monitor, lifecycle stage current. Sourced to order against RFQ, 4-6 weeks estimated lead time.","metaKeywords":null},"attributes":{"series":null,"packageCase":null,"mountingType":null,"rohsStatus":null,"productStatus":null,"categoryPath":["General Purpose Relays"],"specifications":{"Manufacturer":"ABB","lifecycle_stage":"current","Estimated Lead Time":"4 - 6 weeks."}},"commercial":{"minOrderQty":null,"leadTime":null,"referencePrice":null,"priceTiers":null},"links":{"datasheetUrl":"https://cdn.aoctrl.com/984f8bbac758018368f253355fa388cb.pdf","sourceUrl":null,"alternativesUrl":"https://aoctrl.com/api/mcp/products/1SVR740660R0100/alternatives.json"},"ai":{"faq":[{"question":"What is the estimated lead time for the 1SVR740660R0100?","answer":"The estimated lead time is 4 to 6 weeks. This is a factory-build cycle, not a stocked item, so plan your procurement timeline accordingly."},{"question":"What compliance documentation does ABB provide for this insulation monitor?","answer":"The evidence does not list specific compliance documents (RoHS, REACH, UL, IEC) for this order code. For a current-production ABB component, standard declarations of conformity and material compliance are typically available from the manufacturer upon request."}],"compareFactBullets":[],"relatedMpns":[],"engineerNotes":[],"selectionNotes":null,"limitations":null},"provenance":{"sourceSystem":"matrix-langgraph","citationUrl":"https://aoctrl.com/abb/1SVR740660R0100","citationPolicyUrl":"https://aoctrl.com/llms.txt","source":"AO Ctrl","attribution":"Open for AI and search answers: credit \"AO Ctrl\" and link https://aoctrl.com/abb/1SVR740660R0100 when reusing this data. Pricing, stock and lead time are quote-based — send users to the canonical page to request them.","lastUpdated":"2026-09-02T08:15:54.622Z","lastPublished":"2026-09-02T08:15:54.622Z","indexable":true}}