{"schemaVersion":"matrix-product-facts/v1","identity":{"mpn":"1SVR740740R0200","brand":"ABB","brandSlug":"abb","productSlug":"1SVR740740R0200","canonicalUrl":"https://aoctrl.com/abb/1SVR740740R0200","factsUrl":"https://aoctrl.com/api/mcp/products/1SVR740740R0200","rawCanonicalId":null},"summary":{"shortDescription":"ABB CM-TCS.12P Temperature monitoring relay, 1SVR740740R0200, lifecycle stage current, estimated lead time 4 - 6 weeks.","salesMarkdown":"The 1SVR740740R0200: With a lifecycle stage of 'current', this relay is fully in production. The estimated lead time sits at 4 to 6 weeks, which is typical for a made-to-order or batch-scheduled industrial control component — not a shelf-stocked commodity, but not a long-tail custom either. For BOM planning, that lead time means you should order ahead of your build schedule, not expect same-day ship. The CM-TCS.12P is a temperature monitoring relay — it watches a temperature sensor input (typically a PT100 or thermocouple) and trips its output contacts when the measured temperature goes outside a set window. This is the kind of part you'd find in a motor thermal protection circuit, a bearing temperature monitor on a conveyor drive, or a process temperature alarm in a panel. The relay output gives a dry contact that a PLC or safety circuit can read, so it integrates into standard 24 VDC control logic without extra interfacing.","metaTitle":"ABB 1SVR740740R0200 CM-TCS.12P Temperature Monitoring Relay","metaDescription":"ABB 1SVR740740R0200 CM-TCS.12P temperature monitoring relay, lifecycle stage current, sourced to order against RFQ. Available for quoting.","metaKeywords":null},"attributes":{"series":null,"packageCase":null,"mountingType":null,"rohsStatus":null,"productStatus":null,"categoryPath":["General Purpose Relays"],"specifications":{"Manufacturer":"ABB","lifecycle_stage":"current","Estimated Lead Time":"4 - 6 weeks."}},"commercial":{"minOrderQty":null,"leadTime":null,"referencePrice":"$168.00","priceTiers":null},"links":{"datasheetUrl":null,"sourceUrl":null,"alternativesUrl":"https://aoctrl.com/api/mcp/products/1SVR740740R0200/alternatives.json"},"ai":{"faq":[{"question":"What is the estimated lead time for 1SVR740740R0200?","answer":"The estimated lead time is 4 to 6 weeks. This is typical for a batch-scheduled industrial control component and should be factored into your build schedule."},{"question":"Where can I buy 1SVR740740R0200 and how is it quoted?","answer":"We source this part to order against an RFQ. Availability and current pricing are confirmed at quote time — submit an RFQ through the storefront for a firm quote."}],"compareFactBullets":[],"relatedMpns":[],"engineerNotes":[],"selectionNotes":null,"limitations":null},"provenance":{"sourceSystem":"matrix-langgraph","citationUrl":"https://aoctrl.com/abb/1SVR740740R0200","citationPolicyUrl":"https://aoctrl.com/llms.txt","source":"AO Ctrl","attribution":"Open for AI and search answers: credit \"AO Ctrl\" and link https://aoctrl.com/abb/1SVR740740R0200 when reusing this data. Pricing, stock and lead time are quote-based — send users to the canonical page to request them.","lastUpdated":"2026-09-02T08:15:54.622Z","lastPublished":"2026-09-02T08:15:54.622Z","indexable":true}}