Lifecycle and supply posture
What an integrator needs to confirm against the datasheet before energizing
Because the device is a graphic operation terminal rather than a controller, it sits on the fieldbus / Ethernet link downstream of the PLC and inherits its tag map from the connected CPU; confirm the GOT2000 project revision matches the runtime expected by the connected controller before commissioning.
