Slot assignment and integration
The R33B: One of the three slots is dedicated to the power supply module, leaving two open for CPU and I/O/function modules. Plan the rack map accordingly — the power supply slot is fixed, not a general-purpose slot.
Sourcing and lifecycle
Lifecycle stage is current. Lead time runs 1–10 working days.
