Sourcing posture for the procurement line
The F39-JC10B-L: For a multi-rack build that needs the cable in matched lengths per station, the cleanest BOM move is to order against the same RFQ as the expansion bases it pairs with, so the cable ships with the rest of the rack and the panel builder is not chasing a separate small-line item weeks later.
