EOL hot — what that means for a BOM line
The 1FK7042-5AK71-1EA0: For an integrator with a multi-year machine buildout or a maintenance fleet, the practical move is to confirm a quoted quantity and an authorized trace before committing the BOM line — not assume the next shipment behaves like a current-production part.
