EOL/HOT — independent channel sourcing is the realistic path
The 1FK7060-5AF71-1FH0: For a controls integrator mid-BOM-freeze, the call is to lock quantity against whatever surplus is still moving and pin a second-source gate early rather than assume a factory reorder will be honoured.
