Mature lifecycle, project-ready lead time
The 6SL3130-7TE28-6AA3: Estimated lead time is 1-2 weeks — a reliable window for scheduling panel integration and hitting the install date without buffer padding.
Siemens 6SL3130-7TE28-6AA3 Module for Drives, AC Drives (VFD) category, shipping weight 24 kg, lifecycle stage mature, estimated lead time 1-2 weeks.
| Parameter | Value |
|---|---|
| Shipping weight | 24 kg |
| Estimated lead time | 1 - 2 Weeks |
The 6SL3130-7TE28-6AA3: Estimated lead time is 1-2 weeks — a reliable window for scheduling panel integration and hitting the install date without buffer padding.
Submit an RFQ through this listing. The estimated lead time is 1-2 weeks.
No related articles