Sourcing and lead time
The 1SVR740740R9200: Estimated lead time sits at 4 to 6 weeks on this line — a typical window for a current-production ABB control relay.

ABB CM-TCS.22P temperature monitoring relay, 1SVR740740R9200, lifecycle stage current, estimated lead time 4 - 6 weeks.
The 1SVR740740R9200: Estimated lead time sits at 4 to 6 weeks on this line — a typical window for a current-production ABB control relay.